Nut in which a nylon ring is pressed onto the bolt thread to give prevailing torque. ISO 7040 is the regular type and ISO 10511 is the thin type. Prevailing torque performance is in ISO 2320.
Status: Current
Key points
- The current edition of ISO 7040 extended the range to M39 and added stainless steel nuts. In the 2012 edition, ISO 7040 was M3–M36, classes 5, 8, 10, and ISO 10511 was M3–M36, classes 04, 05.
- ISO 7040 has the ISO 4032 (style 1) height and ISO 10511 has the ISO 4035 (style 0) height, with the prevailing torque part added. In the current edition the height of the prevailing torque part is made the same for regular, high and thin types.
- ISO 10511 (thin type) has low load capacity and does not guarantee resistance to thread stripping.
- Prevailing torque nuts are paired only with bolts of the same property class (an exception to the "replace with a higher strength nut" rule of ISO 898-2).
- DIN 985 was replaced by DIN EN ISO 10511, and DIN 982 by DIN EN ISO 7040. For ISO 10511 (2012 edition) M10, the width across flats is 16 mm and the maximum height is 8.56 mm.
Checks for BOMs and buying
- For a "nylon nut" line without the type (regular type, thin type), ask again.
- Prevailing torque arises only when the bolt end passes completely through the nylon ring.
- The nylon ring is weak at high temperature. For high-temperature locations, consider all-metal prevailing torque nuts.
- The prevailing torque of a disassembled nylon nut decreases, so replacing it with a new one is recommended.
- When changing a line marked DIN 985 or 982 to an ISO product, compare height and width across flats. Purchase based on the standard stated.
Equivalent and superseding standards
- DIN 982 · DIN 985 Replaced by ISO 7040 · ISO 10511
- KS B 1044 Domestic non-metallic insert prevailing torque nut
- ASME B18.16.6 Inch nylon insert nut
These links go to the issuing bodies; they are not the verification source of individual values.
Basis: ISO 7040 · ISO 10511 · ISO 2320 · ISO 898-2 · library-wide review 2026-10 (no per-item review date). Project edition, tolerances and service conditions must be confirmed against the standard text and supplier documents. Do not estimate unconfirmed values.