Applicable standards and designations to distinguish
The standards below are not a list of interchangeable substitutes with the same dimensions and requirements. We compare against the standard and edition in your BOM and the drawing requirements.
| Body / basis | Standard and scope |
|---|---|
| ISO | ISO 1207 (cheese) · ISO 1580 (pan) · ISO 2009 (countersunk) · ISO 2010 (raised countersunk) |
| DIN | DIN 84 · DIN 85 · DIN 963 · DIN 964 (each superseded by ISO) |
| KS | KS B 1021 (slotted screw) |
Dimension table
Nominal-size dimensions of ISO 1207: 10 sizes, M1.6–M10. Open the Slotted Machine Screw dimension table →
Differences to check before buying
- Slotted screws come in four heads: cheese (cylindrical), pan, countersunk and raised countersunk. Please state the head.
- For countersunk and raised countersunk heads, the overall length is measured; for cheese and pan heads, length is measured from under the head.
- For steel, 4.8 and 5.8 are within the standard range, and for stainless steel, A2-50 and A2-70.
Materials and surface treatments we distinguish when reviewing
Material and strength designations
Carbon steel 4.8 · Stainless steel A2 (304 series)
Surface treatment designations
White zinc (trivalent) · Nickel plating · Untreated (stainless steel) · Untreated (bare)
These are review items, not a statement that every combination is available. Confirm against the applicable standard and your service conditions.
What to put in the RFQ for this item
No new form is needed: send your existing BOM, notes or request. Missing specifications come back as questions.
Item: Slotted Machine Screw Applicable standard and edition: [as written in your BOM or drawing] Nominal size, pitch, length: [exactly as written] Material and grade / surface treatment: [your requirement] Quantity and unit / required date and delivery site: [your request] Documents: [e.g. EN 10204 3.1, CoC]Send a BOM or RFQ →
Compiled from the public catalog designations and guidance. A review date is not recorded per item. For design and contracts, check the applicable standard text and your drawing; do not estimate unconfirmed values.






