Applicable standards and designations to distinguish
The standards below are not a list of interchangeable substitutes with the same dimensions and requirements. We compare against the standard and edition in your BOM and the drawing requirements.
| Body / basis | Standard and scope |
|---|---|
| Other | Manufacturer specification (approved products: the specified manufacturer) |
Differences to check before buying
- This is the bolt-type anchor called 'set anchor' (set-anka) in Korea. The bolt, sleeve (pipe), washer and nut come as one set.
- Insert it into the hole and strike the sleeve with an anchor punch to expand and fix it, then fit the fixture and tighten the nut.
- The female-threaded type that carries threaded rod from the ceiling is the 'strong anchor' (seuteurong-anka; drop-in anchor). Choose a set anchor if the bolt must protrude, and a strong anchor if threaded rod is to be screwed in.
- Some sellers mix the names. When ordering, also state whether it is the 'bolt type (male thread)' or the 'female-thread type'.
- For 3/8 (3-bu), lengths of 75–200 mm are in circulation. Drill diameter follows the manufacturer's data.
Materials and surface treatments we distinguish when reviewing
Material and strength designations
Carbon steel · STS304
Surface treatment designations
Electro-galvanized · Hot-dip galvanizing · Untreated (stainless steel)
These are review items, not a statement that every combination is available. Confirm against the applicable standard and your service conditions.
What to put in the RFQ for this item
No new form is needed: send your existing BOM, notes or request. Missing specifications come back as questions.
Item: Stud Anchor, Hammer-Set Sleeve Type Applicable standard and edition: [as written in your BOM or drawing] Nominal size, pitch, length: [exactly as written] Material and grade / surface treatment: [your requirement] Quantity and unit / required date and delivery site: [your request] Documents: [e.g. EN 10204 3.1, CoC]Send a BOM or RFQ →
Compiled from the public catalog designations and guidance. A review date is not recorded per item. For design and contracts, check the applicable standard text and your drawing; do not estimate unconfirmed values.





