ASME B16.20

ASMEStandard

Metallic Gaskets for Pipe Flanges

← Back to topicSend a BOM or RFQ →

Standard for materials, dimensions, tolerances, and marking of metallic gaskets for B16.5 and B16.47 flanges. It covers ring joint (R, RX, BX), spiral wound, and grooved metal gaskets with covering layers.

Status: Current

Key points

  • Ring joint gaskets: R, RX, and BX types. Maximum hardness is set by material, and they are identified by ring number.
  • Spiral wound gaskets: the tables set dimensions for B16.5 and B16.47 Series A and B, the inner ring inside diameter, and the maximum flange bore they can be used with, and the material is indicated by color.
  • The current edition (2023) has three parts: ring joint, spiral wound, and grooved metal gaskets with covering layers (commonly the Kammprofile type); the metal jacketed gaskets of earlier editions were dropped.
  • A ring gasket must be of a softer material than the flange groove, so there is an upper hardness limit.
  • Nonmetallic flat gaskets are covered separately by ASME B16.21.

Checks for BOMs and buying

  • If the ring gasket hardness is higher than the flange groove, the groove is damaged. Check the gasket material and hardness together with the flange material.
  • If the gasket type changes (spiral wound for RF <-> RTJ ring), recheck the stud length too.
  • A spiral wound gasket compresses to its design thickness only when the bolt load is sufficient. When combining with low-strength bolting, check with the gasket manufacturer.
  • In the BOM, write the gasket designation down to type, NPS, Class, and material (winding material, filler, ring).

Equivalent and superseding standards

  • ASME B16.21 Nonmetallic flat gasket
  • EN 1514 series Gasket for European PN flanges

ASME: official search ↗

These links go to the issuing bodies; they are not the verification source of individual values.

Basis: ASME B16.20 · library-wide review 2026-10 (no per-item review date). Project edition, tolerances and service conditions must be confirmed against the standard text and supplier documents. Do not estimate unconfirmed values.