RF has a gasket fitted on a raised face, and RTJ has a metal ring (R, RX and BX types of ASME B16.20) fitted in a groove. Confirm the ring number and stud length from the table of the applicable flange standard.

Key points

  • RTJ rings come in R, RX and BX types, and the pipe size that fits each type is set by a table (ASME B16.20).
  • RF raised face height: Class 150 and 300 are 1/16" (converted 1.6 mm), Class 600 is 1/4" (converted 6.4 mm).
  • ASME Interpretation B16.5-18-07 (covering B16.5-2009): B16.5 sets no tolerance on RF height.
  • For the same Class and NPS, RTJ studs are often longer than RF. Example: Class 150 NPS 8 is RF 4-1/4", RTJ 4-3/4".
  • For Class 150 NPS 1/2 and 3/4, public charts have no RTJ stud length.
  • ASME Interpretation 2-34 (covering B16.1-1989 and B16.5-1988): bolting an RF flange to a flat-face (FF) flange is not prohibited.

Checks for BOMs and buying

  • If an RTJ flange is bought with the RF length, nut engagement falls short. Write the face type in the BOM.
  • An RTJ ring must match both the type (R, RX, BX) and the number. Check the bolt BOM and the ring BOM together.
  • When flanges with different RF heights (1/16" and 1/4") are mated, the table length does not fit. Recalculate the length.
  • For joints mating RF and FF (cast iron or non-metallic flanges, etc.), review the gasket type and bolt tightening conditions separately.

ASME: official search ↗

These links go to the issuing bodies; they are not the verification source of individual values.

Basis: ASME B16.5 · ASME B16.20 · ASME B16.5 interpretation 2-34·B16.5-18-07 · Cross-checked against three or more manufacturer and distributor datasheets (not yet checked against the original standard) · library-wide review 2026-10 (no per-item review date). Project edition, tolerances and service conditions must be confirmed against the standard text and supplier documents. Do not estimate unconfirmed values.