boltnoteSend an RFQ →

Home › Standards glossary › Inspection, traceability and documents › Salt spray test (ISO 9227 · ASTM B117)

Salt spray test (ISO 9227 · ASTM B117)

ISOTest

Salt spray (fog) test

← Back to topicSend a BOM or RFQ →

An accelerated test in which an approximately 5 % sodium chloride solution is sprayed as a mist in a test chamber to compare the relative corrosion resistance of coatings. "480 h" in a coating specification means no rust may be visible during that time.

Key points

  • Neutral salt spray (NSS) is represented by ISO 9227 and ASTM B117, and ISO 9227 uses an approximately 5 % sodium chloride solution. ISO 9227 also has acetic acid salt spray (AASS) and copper-accelerated acetic acid salt spray (CASS).
  • For zinc-family coatings, the times to white rust (zinc corrosion product) and to red rust (base steel corrosion) are looked at separately.
  • For zinc flake (ISO 10683), grades (240 to 960 h) are set on the criterion of no red rust for the specified time.
  • Accelerated test time is not directly proportional to actual service life. Use it as a tool for comparing coatings.
  • Some specifications also require cyclic corrosion tests (repeated salt, drying and wetting) that are closer to the real environment.

Checks for BOMs and buying

  • If only "salt spray 480 hours" is written without saying white rust or red rust, the judgment can differ.
  • ISO 10683 has the parts tested 24 hours after coating, in the condition before sorting and packing. Delivered goods that have gone through transport and automatic sorting may have lower corrosion resistance than the test result.
  • The test result is a value for the parts tested. If a test on the delivered lot is needed, specify it separately when ordering.

ASTM: official search ↗ · ISO: official search ↗

These links go to the issuing bodies; they are not the verification source of individual values.

Basis: ISO 9227 · ASTM B117 · ISO 10683 · library-wide review 2026-10 (no per-item review date). Project edition, tolerances and service conditions must be confirmed against the standard text and supplier documents. Do not estimate unconfirmed values.