A stud with an unthreaded shank in the middle and threads at both ends. Tap-end types, with one end driven into a tapped hole in the body, are specified by DIN 938, 939, 835 and 940, KS B 1037, JIS B 1173, and for inch ASME B18.31.2.
Key points
- DIN tap-end studs are divided by the thread length on the driven end (bm): DIN 938 ≈1d, DIN 939 ≈1.25d, DIN 835 ≈2d, DIN 940 ≈2.5d.
- The driven-end length is chosen by the base material: DIN 938 (≈1d) is mainly for steel, and DIN 940 (≈2.5d) is for light metals of lower strength.
- Inch double-end studs fall under ASME B18.31.2, with types having equal thread length at both ends and types with a different tap end. An interference-fit thread (ASME B1.12 Class 5) is sometimes used on the tap end.
- They are widely used as basic fastening parts for pump casings, bearing housings, seal glands and valve bonnets.
- The KS standard title is KS B 1037 "stud bolt", and JIS is B 1173 "植込みボルト (bolt to be planted)".
Checks for BOMs and buying
- Confirm from the drawing whether the order length is the overall length or the length excluding the driven end.
- Thread tolerances on the driven end and the nut end may differ (inch Class 5 interference fit). Take the drawing notation as is.
- "Double-thread bolt" is a term used for both continuous thread studs and double-end studs, so check for a shank and the thread length on both sides.
- If the tapped thread in the body is damaged, consider a thread insert repair before replacing it with a stud of the same nominal size.
Equivalent and superseding standards
- DIN 938 · 939 · 835 · 940 Driven end ≈1d · 1.25d · 2d · 2.5d
- KS B 1037 Stud bolt
- JIS B 1173 植込みボルト
- ASME B18.31.2 Inch double-end stud
ASME: official search ↗ · Korean Standards (KS): official search ↗ · JISC: official search ↗ · DIN: official search ↗
These links go to the issuing bodies; they are not the verification source of individual values.
Basis: DIN 938 · DIN 939 · DIN 835 · DIN 940 · KS B 1037 · JIS B 1173 · ASME B18.31.2 · ASME B1.12 · library-wide review 2026-10 (no per-item review date). Project edition, tolerances and service conditions must be confirmed against the standard text and supplier documents. Do not estimate unconfirmed values.