The heat number is the number of the unit of steel made in a single melt, and the lot is a product unit grouped by the same heat, the same diameter, and the same heat treatment. It is the key connecting certificates and products, so the numbers on markings, labels, and documents must be the same.
Key points
- Chemical composition is set per heat, and mechanical properties differ by heat treatment lot and diameter. So one certificate usually represents one "heat + diameter + heat treatment lot".
- ISO 16228 requires that fasteners can be traced to the end by the manufacturing lot number (or traceability lot number) and that manufacturing lots are not mixed. The manufacturing lot number is always included in F3.1 and F3.2.
- A supplier that has issued an ISO 16228 document keeps the process and final inspection records for at least 3 years.
- In EN 10204, when a distributor passes on a certificate, it attaches a means of identifying the product so that traceability between product and documents is not broken.
- Marking the heat number directly on the product is often not an obligation of the product standard, so if needed, write "heat number (or traceability code) marking" in the order specification.
Checks for BOMs and buying
- If multiple heats are mixed in one box, one certificate cannot describe the entire box. Request that packaging and labels be divided by heat.
- If the product has no marking and the number is only on the label, traceability is broken the moment the packaging is opened. Store them separated by heat until installation.
- Even with the same heat, mechanical values differ if the diameter or heat treatment lot differs. Check that the value for the delivered diameter is on the certificate.
- Under ISO 16228, the responsibility for traceability after the original packaging is opened passes to the buyer.