A product test that applies the specified proof load and releases it, then checks that the bolt has no permanent elongation and the nut threads are not stripped. It confirms the properties in the region just below yield on the actual product.
Key points
- Proof load = proof stress × stress area of the threaded portion. The proof stress is set slightly lower than the yield strength.
- The ISO 898-1 bolt proof load test applies the proof load and releases it, then compares the bolt length with that before loading to check that there is no permanent elongation.
- ASTM F606/F606M provides the length measurement method, yield strength method, and uniform hardness method for the bolt proof load test.
- The nut is fitted on a test mandrel (or test bolt) and the proof load is applied; the threads must not be stripped or broken.
- Overtapped hot-dip galvanized nuts have reduced thread engagement, so the proof load is lower. ISO 10684 separately specifies the reduced values for M8 · M10 overtapped nuts.
Representative proof stresses
| Grade | Proof stress | Basis |
|---|---|---|
| ISO 8.8 (d ≤ 16 mm) | 580 MPa | ISO 898-1 |
| ISO 8.8 (d > 16 mm) | 600 MPa | ISO 898-1 |
| ISO 10.9 | 830 MPa | ISO 898-1 |
| ISO 12.9 | 970 MPa | ISO 898-1 |
Proof load = proof stress × stress area. Values are from ISO 898-1:2013 Table 3.
Checks for BOMs and buying
- If the certificate only says "proof load passed" with no load value or diameter, ask with what load it was tested.
- Some standards confirm properties by specimen tensile and hardness instead of proof load. If the certificate has no proof load field, first check the standard requirements to see whether it is an omission.
- If an overtapped nut is mated with a general bolt, the engagement is insufficient and it may not withstand the proof load.
ASTM: official search ↗ · ISO: official search ↗
These links go to the issuing bodies; they are not the verification source of individual values.
Basis: ISO 898-1 · ISO 898-2 · ASTM F606/F606M · ISO 10684 · library-wide review 2026-10 (no per-item review date). Project edition, tolerances and service conditions must be confirmed against the standard text and supplier documents. Do not estimate unconfirmed values.