The test load that must leave no permanent deformation when applied to and removed from a bolt or nut. For a bolt it is As × proof stress, about 10% lower than the yield strength. The proof load of M16 8.8 is about 91 kN.

Key points

  • Bolt proof load = As × proof stress (Sp) (ISO 898-1 Table 5). The test methods are in the finished-product proof load test of ISO 898-1 and in ASTM F606.
  • ISO 898-1 proof stress: 8.8 580 MPa (d ≤ 16 mm) · 600 MPa (d > 16 mm), 10.9 830 MPa, 12.9 970 MPa. This is about 88 to 91% of the yield strength.
  • Example: M16 8.8 → 157 mm² × 580 MPa ≈ 91 kN, M16 10.9 → 157 × 830 ≈ 130 kN.

Proof load calculation examples

BoltAsProof stressProof load
M16 8.8157 mm²580 MPa≈ 91 kN
M16 10.9157 mm²830 MPa≈ 130 kN
M16 12.9157 mm²970 MPa≈ 152 kN
M20 8.8245 mm²600 MPa≈ 147 kN

As × proof stress (the same as the ISO 898-1:2013 Table 5 values)

Checks for BOMs and buying

  • Proof load is not the yield load. "Proof load: OK" on a certificate means there was no permanent elongation at that load; it is not a yield value.
  • Overtapped hot-dip galvanized nuts have reduced engagement and lower strength. For structural use, only hardened nuts (A563 DH·DH3, A194 2H) are used as galvanized nuts (RCSC 2025 commentary), and ISO 10684 sets the proof load of M8 and M10 overtapped nuts separately, lower.
  • If only the property class is matched and the diameter range is missed (for example, the 16 mm boundary of 8.8), the value is wrong.

ASTM: official search ↗ · ISO: official search ↗

These links go to the issuing bodies; they are not the verification source of individual values.

Basis: ISO 898-1 · ASTM F606/F606M · ISO 10684 · RCSC Specification for Structural Joints Using High-Strength Bolts · library-wide review 2026-10 (no per-item review date). Project edition, tolerances and service conditions must be confirmed against the standard text and supplier documents. Do not estimate unconfirmed values.