Fluoropolymer (PTFE) coating

CommonCoating

Fluoropolymer (PTFE) coating for bolting

← Back to topicSend a BOM or RFQ →

An organic coating of the fluoropolymer family applied to plant studs and nuts to give corrosion resistance and low friction. It is sometimes applied over a base layer (phosphate, zinc-based, etc.), and torque and thread fit differ from uncoated parts.

Key points

  • Thickness, color, pretreatment and test items are usually set by the purchaser's specification or the coating product data, so state the coating specification concretely in the order.
  • The friction coefficient is low, so axial force is greater at the same torque. Use the torque value for the coating and tighten in stages.
  • Color (blue, green, black, etc.) differs by supplier and does not indicate grade or quality.
  • For ASTM bolting too, the coating specification is stated separately in the quotation and order. The manufacturer's certificate is usually the result for the condition before coating.
  • A coating cannot turn B7 into B7M, and does not replace the material requirements for sour-exposed bolting.
  • The upper service temperature differs for each coating product, so check it in the product datasheet.

Checks for BOMs and buying

  • If the uncoated torque table is used as is, over-tightening may yield the stud or over-compress the gasket.
  • If the nut is tight because of the coating thickness, agree the thread fit (stud dimensions, nut tapping) with the coating supplier in advance.
  • Where the wrench has contacted and stripped the coating, only the base layer remains and rusts first. When reusing, check coating damage and thread condition.
  • Whether to apply another lubricant over a coated stud follows the conditions of the coating supplier's torque data.

ISO: official search ↗

These links go to the issuing bodies; they are not the verification source of individual values.

Basis: ISO 16228 · library-wide review 2026-10 (no per-item review date). Project edition, tolerances and service conditions must be confirmed against the standard text and supplier documents. Do not estimate unconfirmed values.